Gateway Submission Centre

Manage regulatory gateway applications to the Building Safety Regulator

Building Safety Act 2022 Gateways

Higher-risk buildings must pass three regulatory gateways before occupation. Each gateway requires submission of detailed information to the Building Safety Regulator (BSR) for assessment. As Principal Designer, you have legal accountability for the accuracy of gateway submissions.

1
Gateway 1 — Planning
Planning gateway: Before planning permission is granted
Approved

Submission Date

15 Jan 2025

BSR Reference

BSR-G1-2025-00847

Outcome

Approved

Requirements Met

12 of 12

Legal reference: Building Safety Act 2022, s.31(2)

View Submission
2
Gateway 2 — Before Construction
Construction gateway: Before building work begins
In Progress

Due Date

30 Apr 2026

BSR Reference

Outcome

Awaiting submission

Requirements Met

14 of 18

Preparation Progress78%

Preparation Checklist Summary

Design Documents2/3
Fire Safety2/4
Structural2/3
Competency Declarations3/3
Change Control Log1/2
Client Confirmation2/3

6 mandatory items incomplete

All mandatory items must be complete before submission

Legal reference: Building Safety Act 2022, s.31(3)

Continue Preparation
3
Gateway 3 — Before Occupation
Completion gateway: Before the building is occupied
Not Started

Due Date

TBC

BSR Reference

Outcome

Awaiting submission

Requirements Met

0 of 24

Legal reference: Building Safety Act 2022, s.31(4)

Begin Preparation
Building Registration
Register the building with the BSR before occupation
Not Started

Building registration is required after Gateway 3 approval and before residents can occupy the building. This includes registering the Accountable Person and Building Safety Manager details with the BSR.